sharepoint - Problem with final branch in a parallel activity -


It may sound like a silly thing, in the parallel activity, the last branch I will clarify it is a There is parallel activity in which each one is made easy by changing the work, changing work and on full work. In which work the final task is completed, it starts breaking the branch. Therefore, every work does the right thing in itself, but for the last time it encounters any problem.

Say the user clicks on the final input link and opens the attached profile form and submits it. The event handler for the execution is synced to that on-task, where an actioned variable is set to the right which exits the loop. I have successfully hit a breakpoint on this line, so I know that this happens. Although the final activity in that branch is not completed, the entire task hit.

Submit when clicked in the final form, the operation screen in the ProgeeScreen tells for a while before returning to the workflow status page. The work that was opened and accumulated, he says, "did not start"

I can disable any branch to leave only two, but with the completion of the last date this is the problem. Earlier in the workflow I do the same thing from the same thing. I have another 3 branch parallel activity in which each batch containing a task is done. It works in a right way Which makes me believe that this can be a problem with two parallel workers in the same sequential workflow .

I have considered the possibility that this can be a correlation token problem token that the use of every work branch is unique to that branch and that the name of the owner activity is for the branch. It argues that if the work full variable is actually set to true, but when the loop does not exit, then there is a wire crossing with variables anywhere. Although I still might have thought that working status on the workflow status page can at least say that the work is in progress.

This is a bug showcase for me, a bug, any ideas or suggestions will be too much so that I can test them.

Re-assigning the work of my workflow to the task, after the expiration of the due date of work This is the provider after fireing the delay activity. In my workflow I have a parallel replication that is used to assign different tasks to different users at the same time. In the exact replication I used to listen to one activity In order to open an OnTaskChanged activity + ... + completetask1 in the branch, a delay activity in the right branch of audio activity followed by a CompleteTask2 activity and for the action activity To reassign, there is a code activity. Be sure to have a correlation token on both fully functional activities. All things work fine on the left branch, but there is an error in the right branch, in which there is a delay activity -> fullsheet activity Suppose we have assigned two tasks to 2 users and one hour to complete their tasks, but they do not work to delay work Planet. Then the first work will be completed in the workflow, but the error for the second task.

I think the problem is with the executable property of completetask.it, it is not updated with the second task id, so it tries to complete a task that is complete.


Comments

Popular posts from this blog

c# - ListView onScroll event -

PHP - get image from byte array -

Linux Terminal Problem with Non-Canonical Terminal I/O app -